Many schemes start out as a spreadsheet on a manager’s computer. Records are updated and maintained regularly by hand. The larger the spreadsheet gets, the more difficult it is to manage and maintain. There comes a point when the spreadsheet data needs to be moved to a system that is significantly easier to manage. Moving can feel risky, but staying on a spreadsheet is usually riskier. Done in the right order, a migration is a controlled, step-by-step job, and this checklist sets out that order.

1. Why spreadsheets break down as a scheme grows

A spreadsheet-based system requires continuous maintenance to keep the information updated and error free. With so many rows and columns of data, mistakes can easily be made if the correct processes are not followed. Data gets left out, duplicate rows are accidentally created and there is no record of who changed what, so there is no audit trail and the public register is only ever as current as the last manual update. These are common issues in a spreadsheet-based system that can be solved by a purpose-built platform.

2. Audit what you have

A spreadsheet scheme can contain different types of information, and these should be identified before the migration begins.

  • Owners: individuals, organisations and other groups

  • Linked documentation: inspection sheets, PDF certificates and invoices

  • Private and confidential: email addresses, phone numbers and payment records. Never migrate card details: payments belong with your payment provider, not in the new platform.

  • Required and optional: identify which data can be left out while still keeping a valid record.

  • Formulas: these do not need migrating, but they show how your data is calculated, so document them before you move.

3. Clean before you move

  • Missing content: a gap in a record could mean the whole record should be removed, or simply that the field was optional. Decide which before you migrate, to avoid errors afterwards.

  • Dates: dates are often entered in different formats, as numbers, as text or in the American month-first order. Convert them all to one format before you migrate.

  • Duplicates: the same record can appear twice. This can easily happen if there is a very long list of records and different users edit the document using different processes.

  • Expired: old records that are no longer needed. A device could be retired or damaged and beyond repair, and its certificate would be long overdue for renewal.

4. Decide what history to bring across

Some older data is no longer relevant. A device may have been scrapped, or an organisation may have closed, since the record was created, and these records can be archived rather than migrated. A certificate may have been expired for a long time, and it is very unlikely that it would be renewed. Depending on your scheme’s policy, these can be archived too. Whatever you decide, keep the archive accessible, as you may need it for an audit or a complaint.

When we rebuilt PIPA’s national inspection and certification platform, accurately transferring and validating every historical inspection and certificate was the first priority. History is what gives a register its credibility, so it is worth getting right.

5. Testing migrations

Before a complete migration of all the data takes place, a test migration should be performed first. The test migration should use a broad test sample of real data covering all the different possible scenarios that could appear. The results should then be checked by the scheme team, who know the data well enough to spot errors quickly.

6. Run old and new

To avoid unforeseen issues, run the old and new systems side by side for a set period. This allows users to temporarily revert to the old system if there are some tasks they cannot complete. It also builds users’ confidence in the new system, as they can see the improvements in the processes.

It’s important to set a firm date for the complete switch over. Without a target date there is a risk that both systems will continue to exist side by side. When that happens, information ends up split between the two and neither is correct.

7. Tell members what is changing

Your members, inspectors and anyone who uses your public register need to know what is changing, when, and what they need to do differently. Tell them early, explain what is better for them, and give clear dates: when the old system stops, when the new one starts and whether they need new logins. Send a reminder shortly before the switch, and make it easy to ask questions in the first few weeks.

8. Switch Over

Once the scheme has switched over to the new platform, check the public register first. It is the part of your scheme the public sees, so test it thoroughly: search for a range of members, check tags and certificates, and make sure expired or suspended records show correctly.

How 16i helps

We build platforms for certification, inspection and registration schemes, and data migration is part of every project. We map and clean your records, run test migrations with your team and switch over with you, so your register stays live throughout. See platforms for certification and inspection schemes and public register software.

Other Articles